Wind Tower Manufacturer - Keystone Tower Systems / NOV
Complete Wind Tower Manufacturer! Most equipment is from 2024 or newer!
This auction features a complete wind tower manufacturing facility liquidation, offering an extensive selection of late-model steel fabrication, plate rolling, welding, and material handling equipment. Most equipment is from 2024 or newer, along with thousands of tons of new steel and wind tower inventory.
AUCTION DAY: December 8, 2026 at 10AM (Central)
Inspection Date: By appointment only
Removal: Removal begins the day after the auction.
Featured items include:
PLATE ROLLING & STELL FABRICATION EQUIPMENT
- 2025 Davi P30 Four-Roll Plate Roll (3″ x 10′ capacity)
- 2024 Veracity CNC Plasma Cutting Table
- Plate beveling machines
- Flange milling machines
- PEMA flanging and fitting stations
WELDING & PRODUCTION EQUIPMENT
- Submerged Arc (SubArc) Welding Manipulators
- Heavy-duty turning rolls
- Additional wind tower fabrication and assembly equipment
SURFACE PREPARATION & FINISHING
- 120-foot blasting and painting booths
- Additional surface preparation and finishing equipment
CRANES & MATERIAL HANDLING
- 2025 Cimola 135-Ton Rough Terrain Crane
- Permadur sheet lifters
- Additional heavy-duty lifting and material handling equipment
STEEL & WIND TOWER INVENTORY
- 1,580 tons of new American-made, American-melted plate steel with material certifications
- 3,000 tons of new wind towers
ADDITIONAL ASSETS
- Extensive inventory of industrial tooling, manufacturing equipment, and production support assets
- Majority of equipment manufactured in 2024 or newer
- See the full auction catalog for complete equipment listings and inventory details